The Onodani River Project

Kiho-cho, Mie Prefecture, August 1988

David's introduction: It's the summer of 1988, and my family (myself, my then wife, and our two pre-school daughters) are spending the month of August at her family home in Mie Prefecture. Joining us were her sister and her two daughters (one in Elementary school, and one in Middle school), and we were also accompanied by one of the young students from the 'English Conversation School' that I was running at the time from my home in Hamura, Tokyo.

The old house is located in the small village of Ozato, through which runs the Onodani River. The valley is wall-to-wall rice fields, and the river has been dammed at one place, to allow control of the water flow and to create a reservoir for irrigation.

Behind the low dam a pool has formed, providing a wonderful place for swimming and water play. (It also provided the background for this short piece I wrote for the Yomiuri newspapers, as well as quite a few of the stories I sent to the Mainichi Weekly, like this and this).

That's the 'setting' for our story today, but you need to know something else - the Japanese school year begins in April, running through until the following March. There is a summer break, but unlike the summer holidays that I remember from my Canadian youth - which always corresponded with a change in the school year, and were thus _real_ holidays - the break for Japanese students comes _within_ a school year, so it is the custom for teachers to assign homework to be done over the summer. Most of this is usually standard worksheets to process, but a very common assignment is the 自由研究 'Free-style research project'. Students are expected to come up with something to study, and prepare some kind of report which they will present to the class when the break is over.

So there we were. Everybody looks at me, "OK Uncle Dave, any ideas ...?" Uncle Dave did indeed have ideas. But over and above anything else, he did not want to cooperate in _anything_ that would have these kids stuck at a desk, pencils in hand. We needed to get outside ...

Here is _my_ 自由研究 report from that summer. The main map that you see below is actually our draft copy. Once the data was all collected on this sheet, the three researchers then each carefully drafted their own presentation maps, drew explanatory figures, and wrote their own accompanying papers, which they took back to their respective schools at the end of the summer. What you see on this page is my own version of the report.

The Onodani River Project

Kiho-cho, Mie Prefecture, August 1988

Researchers:

Advisors:

 

Purpose

  • To examine a segment of the Onodani River, in Ozato, Mie Prefecture.
  • To survey this river with tools of our own design and construction, and make a true-scale map with the resulting data.
  • To make a depth survey of the river bottom, and record the findings on our map.

 

Survey Techniques and Equipment

The basic technique used for the survey was 'triangulation'. Two 'rotating protractors' were made to do this. First, a piece of thin plywood 30cm square was cut, and a 25cm circle was drawn on top. Using a large protractor, this circle was marked off in degrees (0 - 359). Next, a 25cm circle of card was prepared, cut and folded, to make a sighting guide (Figure 1).

This card was then nailed to the centre of the plywood circle, where it was free to rotate for sighting (Figure 2).

The plywood was then fastened to a heavy block of wood for a base. Two of these 'rotating protractors' were made.

One protractor was set up on each bank of the river. Locations were chosen that offered clear views of all important reference points to be measured. Using a magnetic compass, both protractors were aligned with magnetic north. This was then checked by sighting each other. The two readings were 182º and 2º, which proved that the alignment was correct.

Nineteen reference points were then chosen in the area to be surveyed. These were places where the riverbank made an angle, or points at the corners of various concrete constructions, etc. Three teams were formed, one on each protractor, and one in a small boat, who carried a small bright pole for the observers to sight on.

The team in the boat travelled to each of the 19 points in turn, and held the pole in place at each point. The teams at the protractors carefully sighted on the pole and made a note of the angle between North and the pole location (Figure 3).

The data thus collected was then used to make the map of the river.

 

Map Making

One point on a large sheet of paper was chosen to represent one of the two observing positions ('A'). A line was drawn to represent North, and the angle of 2° was measured off to show the direction of the other position. A point on this line was chosen to represent the other observing position ('B') (Figure 4).

Next, the protractor was placed on Position B and North was found by sighting 182º towards position A. We thus had a location on the map for both of the base stations, and had both of them properly aligned to North (Figure 5).

Then the direction of one of the 19 points was measured from both stations with a protractor aligned to North on the map. The point where the two lines crossed on the paper represented the actual location of the river point surveyed (Figure 6).

This procedure was repeated for each of the 19 points which had been surveyed. With all these points now located on the paper, the river bank could be drawn in. This resulted in a good likeness of the actual shape.

As our two base points were too far apart in reality to permit a direct measurement of the distance between them, we measured the distance between two of our reference points (#8 #12). This turned out to be 21.7 meters. On our map this was measured at 21.7 cm, and thus our scale was 1/100. This was no coincidence, as we had made a rough sample of our map before starting our final copy, and from this we chose a good scale.

 

Depth Sounding

Upon completion of the map, we returned to the river to collect data on the depth. A long bamboo pole was marked off in cm's, and a 30 meter rope was marked off in meters. As one bank of the river was fairly straight, we used this side as our starting point for depth measurements.

Using our prepared rope, we marked off the river bank in 2 meter increments. From each of these points one team member waded into the water carrying the bamboo pole and one end of the rope. Another worker on shore paid out the rope in 2 meter increments, stopping each time to allow the wading person to sample the depth and call the result back to the bank, where it was noted by another team member. This technique was used in areas of the river which did not exceed 150cm in depth (the tallest member of the team was 180cm).

For deeper portions of the river we used a small rubber boat. The measured rope was tied to the front of the boat, and another rope to the back. This rear rope was held by a member on the far bank. One person rode in the boat and, as it was pulled across the river in 2 meter increments, took the depth measurements. One person on shore paid out the rope, and another took down the data (Fig. 7).

In these ways, a total of 509 measurements were taken. When the entire river segment had been surveyed, the data points were lightly marked on the map. Using this information, lines connecting points of equal depth were drawn, resulting in a complete three dimensional survey of the river.

 

Problems

Some difficulties were encountered during the project. The greatest obstacle to completion of the project was undoubtedly the weather. Day after day we waited for the endless rains to stop before we could begin. When the sky finally cleared, we found that the water level was still much too high to allow safe travel on the water. Even after we started, we found that the water level fluctuated up and down each day, due to rain showers in the valley. Every time we ventured out to take depth measurements, we checked the river level, and made adjustments to our figures accordingly.

Another problem was in our rotating protractors. We had originally thought that measuring to within 1º would suffice, and our first attempt at surveying the river was done quite quickly. The resulting map was useless. We had located our base positions near one end of the stretch being measured, and this resulted in sighting far distances to the other end. At this long distance, even a tiny error in reading the scale, resulted in a large error on the resulting map. Thus, we made a second series of sightings, with the base stations located near the center of the project area, then sighted very carefully. This map is accurate.

 

Conclusion

All in all, we consider this project to be a success, and we think our final results are quite accurate. We have learned something about surveying, having built and used our own surveying instruments. We have learned how to construct a realistic map, using our own surveyed data, and have had the experience of taking a complete series of soundings in a body of water.

If time had permitted, we had hoped to take measurements of the temperature at varying depths, at different times of day, and also to take measurements of current rate and direction at varying points. Perhaps we can undertake these projects next year (if the weather permits).